The Generation Charge is a pass-through component of the Meralco bill. The level of the Generation Charge is adjusted on a monthly basis as prescribed by the Energy Regulatory Commission in its Order dated October 13, 2004 under ERC Case No. 2004-322 approving the "Guidelines for the Automatic Adjustment of Generation Rates and System Loss Rates by Distribution Utilities" or the AGRA.
COMPUTATION of the GENERATION CHARGE for February 2010*
(Applicable for Customers Not Under TOU, CCP, and Ecozone)
Based on January 2010 Generation Costs
|
Source
|
(A)
GWH
(million kWh) Purchased
|
(B) Energy Share
(%)
|
(C) Basic Generation Cost
(PhP)
|
(D) Other Cost Adjustments
(PhP)
|
(E = C+D) Total Generation Cost for the Month
(PhP)
|
(F = E/A) Average Gen Cost
(January
2010)
(PhP/kWh)
|
(G) Average Gen Cost
(December
2009)
(PhP/kWh)
|
(H) Incr / (Decr)
(PhP/kWh)
|
| NPC and WESM |
| NPC** |
641.54 |
30.01% |
3,207.18 |
(216.65)b |
2,990.53 |
4.6615 |
4.3764 |
0.2851 |
| WESM*** |
304.86 |
14.26% |
1,417.39 |
435.20 c |
1,852.59 |
6.0769 |
3.7402 |
2.3367 |
| Subtotal |
946.39 |
44.27% |
4,624.57 |
218.55 |
4,843.12 |
5.1174 |
4.1663 |
0.9511 |
| IPPs |
Dispatch a |
| QPPL |
59.04% |
205.65 |
9.62% |
1,252.36 |
(0.66) d |
1,251.70 |
6.0865 e |
5.6695 |
0.4170 |
| Sta. Rita |
83.96% |
651.57 |
30.48% |
2,952.23 |
- |
2,952.23 |
4.5310 e |
3.2489 |
1.2821 |
| San Lorenzo |
85.30% |
333.83 |
15.61% |
1,516.42 |
- |
1,516.42 |
4.5426 e |
3.5516 |
0.9909 |
| Subtotal |
78.66% |
1,191.05 |
55.71% |
5,721.01 |
(0.66) |
5,720.35 |
4.8028 |
3.7469 |
1.0559 |
|
| Philpodeco |
0.40 |
0.02% |
1.81 |
- |
1.81 |
4.5191 |
4.4057 |
0.1134 |
| MMPC |
0.06 |
0.00% |
0.40 |
- |
0.40 |
6.4764 |
6.1959 |
0.2805 |
|
TOTAL |
2,137.90 |
100.0% |
10,347.79 |
217.89 |
10,565.68 |
4.9421 |
3.9301 |
1.0120 |
|
| Generation Rate Adjustments |
|
| Pilferage Recovery |
(0.0307) f |
(0.0268) |
(0.0038) |
| High Load Factor Rider |
0.0151 |
0.0134 |
0.0017 |
| TOU Differential |
0.0038 g |
0.0009 |
0.0029 |
| Generation Charge Billing Month -----> |
4.9303
February 2010 |
3.9175
January 2010 |
1.0128
|
Notes:
* based on January 2010 supply month preliminary bills of power suppliers
** includes NPC TSC, Assigned TSC (Masinloc, Makban, Pagbilao, Sual and Calaca) and residual from NPC special programs
*** based on January 2010 preliminary bill and other WESM adjustments
a - The dispatch figures shown are the capacity factors of the IPPs' power plants.
b - for GRAM, ICERA, Franchise and Benefits to Host Communities
c - for Market Fees and other billing adjustments
d - adjustment for transmission line fee
e - The rise in IPP’s overall generation cost was due to the increase in First Gas plants’ lower effective fuel cost, resulting in higher variable costs per kWh. The drop in dispatch of QPPL and Sta. Rita plants also contributed to the increase in IPP rates.
f - represents the amount of PhP65.5 million pilferage recovery returned by Meralco to its customers
g - calculated based on the formula provisionally-approved by the ERC on June 27, 2007 in ERC Case No. 2007-111 RC

Transmission Charge
is another pass-through component of the Meralco
bill. Transmission Charges are adjusted on an annual basis in accordance
with the Order of the Energy Regulatory Commission dated September 28,
2005 under ERC Case No. 2005-06 RM prescribing the "Guidelines for the
Adjustment of Transmission Rates by Distribution utilities" or the TRAM.
The Transmission Charges starting February 2010 billing are shown below:
| |
Rate/kWh |
| Residential & General Service A |
0.8773 |
| General Service B |
266.0621 |
| GHMS |
0.6969 |
| Flat Streetlights |
0.8879 |
| General Power |
| Secondary |
294.2890 |
| Below 13.2 kV |
312.2319 |
| 13.8/13.2 kV |
312.2319 |
| 34.5 kV |
310.5224 |
| 115 kV |
223.7628 |

|