The Generation Charge is a pass-through component of the Meralco bill. The level of the Generation Charge is adjusted on a monthly basis as prescribed by the Energy Regulatory Commission in its Order dated October 13, 2004 under ERC Case No. 2004-322 approving the "Guidelines for the Automatic Adjustment of Generation Rates and System Loss Rates by Distribution Utilities" or the AGRA.

   COMPUTATION of the GENERATION CHARGE for February 2010*
   (Applicable for Customers Not Under TOU, CCP, and Ecozone)
   Based on January 2010 Generation Costs

Source

(A)
GWH
(million kWh)
Purchased

(B)
Energy Share
(%)

(C)
Basic Generation Cost
(PhP)

(D)
Other Cost Adjustments
(PhP)

(E = C+D)
Total Generation Cost for the Month
(PhP)

(F = E/A)
Average Gen Cost
(January
2010)
(PhP/kWh)

(G)
Average Gen Cost
(December
2009)
(PhP/kWh)

(H)
Incr /
(Decr)

(PhP/kWh)

NPC and WESM
  NPC**
641.54
30.01%
3,207.18
(216.65)b
2,990.53
4.6615   
4.3764   
0.2851
  WESM***
304.86
14.26%
1,417.39
435.20 c
1,852.59
6.0769   
3.7402   
2.3367
  Subtotal
946.39
44.27%
4,624.57
218.55   
4,843.12
5.1174   
4.1663   
0.9511
IPPs Dispatch a
  QPPL
59.04%
205.65
9.62%
1,252.36
(0.66) d
1,251.70
6.0865 e
5.6695   
0.4170
  Sta. Rita
83.96%
651.57
30.48%
2,952.23
-
2,952.23
4.5310 e
3.2489   
1.2821
  San Lorenzo
85.30%
333.83
15.61%
1,516.42
-
1,516.42
4.5426 e
3.5516   
0.9909
  Subtotal
78.66%
1,191.05
55.71%
5,721.01
(0.66)   
5,720.35
4.8028   
3.7469   
1.0559
Philpodeco
0.40
0.02%
1.81
-
1.81
4.5191   
4.4057   
0.1134
MMPC
0.06
0.00%
0.40
-
0.40
6.4764   
6.1959   
0.2805

TOTAL

2,137.90
100.0%
10,347.79
217.89 
10,565.68
4.9421   
3.9301   
1.0120
Generation Rate Adjustments  
   Pilferage Recovery
(0.0307) f
(0.0268) 
(0.0038)
   High Load Factor Rider
0.0151    
0.0134  
0.0017
   TOU Differential
0.0038  g
0.0009  
0.0029
Generation Charge
Billing Month ----->      
4.9303   
February 2010
3.9175   
January 2010
1.0128
 

Notes:

* based on January 2010 supply month preliminary bills of power suppliers
** includes NPC TSC, Assigned TSC (Masinloc, Makban, Pagbilao, Sual and Calaca) and residual from NPC special programs
*** based on January 2010 preliminary bill and other WESM adjustments

a - The dispatch figures shown are the capacity factors of the IPPs' power plants.
b - for GRAM, ICERA, Franchise and Benefits to Host Communities
c - for Market Fees and other billing adjustments
d - adjustment for transmission line fee
e - The rise in IPP’s overall generation cost was due to the increase in First Gas plants’ lower effective fuel cost, resulting in higher variable costs per kWh. The drop in dispatch of QPPL and Sta. Rita plants also contributed to the increase in IPP rates.
f - represents the amount of PhP65.5 million pilferage recovery returned by Meralco to its customers
g - calculated based on the formula provisionally-approved by the ERC on June 27, 2007 in ERC Case No. 2007-111 RC



Transmission Charge is another pass-through component of the Meralco bill. Transmission Charges are adjusted on an annual basis in accordance with the Order of the Energy Regulatory Commission dated September 28, 2005 under ERC Case No. 2005-06 RM prescribing the "Guidelines for the Adjustment of Transmission Rates by Distribution utilities" or the TRAM.

The Transmission Charges starting February 2010 billing are shown below:

  Rate/kWh
Residential & General Service A 0.8773
General Service B 266.0621
GHMS 0.6969
Flat Streetlights 0.8879
General Power
  Secondary 294.2890
  Below 13.2 kV 312.2319
  13.8/13.2 kV 312.2319
  34.5 kV 310.5224
  115 kV 223.7628


Last updated: 02/10/2010